100-150m3/hour gold mining trommel machinery

The Raw material into vibrating feeder,then screening the one in big size stone to reduce the abrasion of trommel screen,the other into trommel screen to be classified into 4size 0-6mm; 6-10mm; 10-30mm >30mm >30mm waste material transported by conveyor into scrap area; 10-30mm material transported by conveyor into destination area; 6-10mm material transported by conveyor into destination area; 0-6mm material into mineral box and send to 1200# horizontal automatic discharge gold concentrator by 1set 4 inch sand pump to get concentrate,the waste material discharged from discharge pipe.

gold mining machinery

Technical process-Gold mining machinery
The Raw material into vibrating feeder,then screening the one in big size stone to reduce the abrasion of trommel screen,the other into trommel screen to be classified into 4size 0-6mm; 6-10mm; 10-30mm >30mm
>30mm waste material transported by conveyor into scrap area;
10-30mm material transported by conveyor into destination area;
6-10mm material transported by conveyor into destination area;
0-6mm material into mineral box and send to 1200# horizontal automatic discharge gold concentrator by 1set 4 inch sand pump to get concentrate,the waste material discharged from discharge pipe.

Detail parameter-Gold mining machinery

Production Name

Specification

Quantity

Power

Unit price

Total price

Remark

Base plate

Length 17.5m

1pcs

-

Used type

Vibrating feeder

2000*2200

1pcs

5.87

Including vibrating feeder

Transport conveyor

Belt width 800mm,pole length 7m

1pcs

7.5


Trommel screen

Inner diameter 1.3m,outer diameter 1.6m,screen mesh 4.3m

1set

11

Centrifugal concentrator

1200# horizontal gold concentrator

1set

21.5

Transport conveyor

Belt width 600mm,pole length 6m

3pcs

5.5*3

Sand pump&mineral box

4inch sand pump+11KW motor+mineral box

1set

11

Centrifugal pump

1pcs

5.5

Driving&directions system

2axles 8wheels

1set

-

Customized

Electric box

1set

-

Total power

78.87KW