Raw material 200-300ton/hour gold mining machinery
Work capacity 150-200m3/h alluvial gold mining machinery
Technical process-Gold mining machinery
The raw material into feed hopper by excavator,then high pressure water swilling into reamers trommel screen to be classified into 2size,the big one ans small one,the one in big size into one fixed gold sluice with carpet,the scrap get rid into the scrap pool;
The material in small size into mineral dewater machine by sand pump ,then into mineral box sending to 1200#automatic discharge gold concentrator to be separating finally the concentrate get from concentrate discharge pipe and scrap to get rid into scrap pool.
Detail Parameter-Gold mining machinery
Production |
Specification |
Quantity |
Power |
Unit price |
Total price |
Remark |
Feed hopper |
3500*5500 Material:10mm thickness steel |
1pcs |
- |
|||
Trommel screen |
Reamers trommel screen |
1set |
7.5 |
including the hopper,holding frames |
||
Mineral desliming machine |
2000*3800 |
1pcs |
4.4 |
Polyurethane screen mesh |
||
Gold concentrator |
1200#automatic discharge concentrator |
1pcs |
21.5 |
PLC control |
||
Mineral box and sand pump |
4inch sand pump |
2set |
22 |
|||
Centrifugal pump |
1pcs |
5.5 |
||||
Submerged pump |
5.5KW |
2set |
11 |
|||
Electric box |
including the electric wire to machine,excluding the cable |
1pcs |
- |
|||
Total power |
71.9KW |