Capacity30-50tph Mobile gold mining machinery and separating plants
Gold mining machinery technical process
The material get into feed hopper from excavator then to be swilled into trommel screen with rotary reamers by high pressure water to get rid off the clay,to be classified into 2size,the one in big size is useless directly to be get rid to scrap area.
The one in small size get into the fixed gold sluice with carpet to separate the gold nugget,then flow into mineral box to be sending to horizontal automatic discharge gold concentrator by sand pump,the concentrate to be discharged into concentrate box,the scrap into the scrap pool.
Gold mining machinery detail parameter
|
|
|
|
|
|
Feeding size dia.≦200mm
Water needed: 100m3/h
Driving speed:≦15Km/h |
1set |
9.7KW |
|
|
|
|
|
|
|
|
|
|
1set |
5.5 |
|
|
|
1pcs |
- |
||
|
1set |
3 |
|||
|
1set |
5.5 |
|||
|
50KW |
1set |