250-300m3/hour gold mining machinery vibrating screen+centrifugal concentrator
Gold mining machinery technical process
The raw material getting into feed hopper then into vibrating screen by swilling of high pressure water to be classified into 3size,the big size,the normal size, the small size,the one in big size useless is directly to get rid to scrap pool.
The one in normal price to be recovered by 2fixed gold sluice with carpet,the scrap material to be transported by conveyor after the bucket chain machine taking water off.
The one in small size get into desliming machine by pumping of 1set 8inch sand pump (it’s efficiently the recover of gold concentrator by preventing surface gold covered by the muddy mineral),then the clay-off mineral getting into 2set of horizontal gold concentrator to get concentrate into mineral box,the scrap into scrap pool which finally transported to destination by conveyor after the process of taking water off by buck chain machine.
Gold mining machinery detail parameter
Production Name |
|
|
|
|
|
|
|
4000*5000mm |
1pcs |
- |
|||
|
1st floor: top 3m with suck rod(to protect screen mesh),the other 3m with polyurethane screen mesh, |
1set |
18.5 |
|
||
|
1500*3500mm 0.55KW |
2set |
1.1 |
|||
Gold concentrator |
Horizontal automatic type 21.5KW/set |
2set |
43 |
|||
|
1000*6000mm |
2pcs |
- |
With gold carpet |
||
Bucket chain machine |
60# 11KW |
2set |
22 |
90000 |
180000 |
|
Sand pump and mineral box |
8inch |
1set |
22 |
19000 |
19000 |
|
Sand pump and mineral box |
6inch |
1set |
15 |
15000 |
15000 |
|
Transport conveyor |
Belt width 600mm,pole length 6m,3KW |
2pcs |
6 |
17000 |
34000 |
|
Centrifugal pump |
11KW |
1set |
11 |
6000 |
6000 |
|
Water pump |
5.5KW |
2pcs |
15 |
3500 |
7000 |
|
Electric box |
1pcs |
- |
8000 |
8000 |
||
Total power |
153.6KW |