250-300m3/hour gold mining machinery vibrating screen+centrifugal concentrator

gold mining machine

Gold mining machinery technical process
The raw material getting into feed hopper then into vibrating screen by swilling of high pressure water to be classified into 3size,the big size,the normal size, the small size,the one in big size useless is directly to get rid to scrap pool.
The one in normal price to be recovered by 2fixed gold sluice with carpet,the scrap material to be transported by conveyor after the bucket chain machine taking water off.
The one in small size get into desliming machine by pumping of 1set 8inch sand pump (it’s efficiently the recover of gold concentrator by preventing surface gold covered by the muddy mineral),then the clay-off mineral getting into 2set of horizontal gold concentrator to get concentrate into mineral box,the scrap into scrap pool which finally transported  to destination by conveyor after the process of taking water off by buck chain machine.
Gold mining machinery detail parameter


  Production Name


  Specification


  Quantity


  Power


  Unit price


  Total price


  Remark


  Feed hopper

4000*5000mm

1pcs

-


Vibrating screen

1st floor: top 3m with suck rod(to protect screen mesh),the other 3m with polyurethane screen mesh,
The 2nd floor: with polyurethane screen mesh.

1set

18.5


Including base plate,holding frames etc


Desliming machine

1500*3500mm  0.55KW

2set

1.1

Gold concentrator

Horizontal automatic type 21.5KW/set

2set

43


Fixed gold sluice

1000*6000mm
With carpet

2pcs

-

With gold carpet

Bucket chain machine

60# 11KW

2set

22

90000

180000

Sand pump and mineral box

8inch

1set

22

19000

19000

Sand pump and mineral box

6inch

1set

15

15000

15000

Transport conveyor

Belt width 600mm,pole length 6m,3KW

2pcs

6

17000

34000

Centrifugal pump

11KW

1set

11

6000

6000

Water pump

5.5KW

2pcs

15

3500

7000

Electric box

1pcs

-

8000

8000

Total power

153.6KW