Raw material capactiy 200-300tph alluvial placer gold mining machinery
Raw material capactiy 200-300tph gold mining machinery
Material size below 6mm capacity:80-100tph
Recovery over 90% to visible and single crystal gold
This set of gold mining plant using vibrating feeder to get rid the big size stone then the material into trommel screnn for classifying,finally to get gold concentrate by
horizontal automatic discharge concentrator and fixed gold sluice.
Gold mining machinery Technical process
Raw material from excavator into vibrating feed hopper then well-distributed transported by conveyor to reamers trommel screen to be classified into big size>6mm and small size≤6mm,the one in size >6mm into fixed sluice to get the gold,the scrap into scrap material;
The small getting into 1set 1200#horizontal gold concentrator from 1set 4inch sand pump,the concentrate into concentrate box,the scrap into scrap pool.
Gold mining machinery detail parameter
Production |
|
|
|
|
|
|
|
Vibrating feed hopper |
2200*3000 |
1pcs |
0.38 |
Including shaking feeder |
|||
Transport conveyor |
Belt width600mm,pole length about 9m |
1pcs |
5.5 |
||||
Reamer trommel screen |
Inner dia.:1.3m,outer dia.:1.6m, |
1set |
7.5 |
||||
Fixed sluice with carpet |
1000*4000 |
1set |
- |
Including gold carpet,brand Mitsubishi |
|||
Mineral box and sand pump |
4inch sand pump |
1set |
11 |
||||
|
|
1set |
21.5 |
|
|||
|
5.5KW |
1pcs |
5.5 |
||||
|
5.5KW |
1pcs |
5.5 |
||||
|
1pcs |
- |
|||||
|
56.88KW |