Raw material capactiy 200-300tph alluvial placer gold mining machinery

gold mining machinery

Raw material capactiy 200-300tph gold mining machinery

Material size below 6mm capacity:80-100tph
Recovery over 90% to visible and single crystal gold

This set of gold mining plant using vibrating feeder to get rid the big size stone then the material into trommel screnn for classifying,finally to get gold concentrate by

horizontal automatic discharge concentrator and fixed gold sluice.
Gold mining machinery Technical process
Raw material from excavator into vibrating feed hopper then well-distributed transported by conveyor to reamers trommel screen to be classified into big size>6mm and small size≤6mm,the one in size >6mm  into fixed sluice to get the gold,the scrap into scrap material;
The small getting into 1set 1200#horizontal gold concentrator from 1set 4inch sand pump,the concentrate into concentrate box,the scrap into scrap pool. 
Gold mining machinery detail parameter


  Production


  Specification


Quantity


Power


Unit price


  Total price


  Remark

Vibrating feed hopper

2200*3000

1pcs

0.38

 Including shaking feeder

Transport conveyor

Belt width600mm,pole length about 9m

1pcs

5.5

Reamer trommel screen

Inner dia.:1.3m,outer dia.:1.6m,
Screen mesh 3m,including reamers,driven by chain

1set

7.5

Fixed sluice with carpet

1000*4000

1set

-

Including gold carpet,brand Mitsubishi

Mineral box and sand pump

4inch sand pump

1set

11


Gold concentrator


Horizontal automatic discharge

1set

21.5


  Plc control automatic discharge


Centrifugal pump

5.5KW

1pcs

5.5


Submerged
pump

5.5KW

1pcs

5.5


Electric box

1pcs

-


Gold mining machinery total power

56.88KW