Working capacity 100-150ton/hour dredging depth 25m gold mining machinery
Gold mining machinery technical process
The material from the bucket transported into the trommel screen with reamers which can ream and wash the clay off,then classified into 3sizes ≤6mm,6-15mm,>15mm,the biggest size material >15mm useless are directly discharged to waste area by scrap sluice;
6-15mm material into shaking sluice to get gold nugget, scrap material discharged into the waste area;
The material <6mm getting into the material box through sand pump feeding into a horizontal automatic discharge gold concentrator,then concentrate get into concentrator box, scrap material to be get rid.
Gold mining machinery detail parameter
Production Name |
Specifications |
Quantity |
Power |
Remark |
Pontoon |
Single width 2m,height 1.15m,Length 47m |
1set |
- |
|
Bucket system |
Main frame height:5.6m Double 16#U steel |
1set |
75 |
|
Trommel screen |
The trommel fixed with Reamers: length 2.2m |
1set |
7.5 |
|
Gold concentrator |
1200#Horizontal automatic discharging gold concentrator |
1set |
21.5 |
PLC control |
Shaking sluice |
1350*4500mm |
1pcs |
3 |
|
Arms winding engine |
650#reducer |
1pcs |
18.5 |
|
Main Anchor |
500#reducer |
1pcs |
15 |
|
Winch of anchor line |
3KW |
4set |
12 |
|
Water pump |
7.5KW |
1pcs |
7.5 |
|
Centrifugal pump |
7.5KW |
1pcs |
7.5 |
|
Sand pump |
4inch |
1pcs |
11 |
|
Electricity cabint |
Including the electricity wire to machine |
1set |
- |
|
Power |
Power170KW(advise to use230KW generate set) |