Weathered rock mine work capacity 60-100ton/hour gold mining machinery
Goldmining machinery Technical process
Raw material into vibrating feeder,the coarse mineral in big size into 1set jaw crusher to be crushing,the crushed mineral with the small size of coarse mineral to be transporting into central water supplying trommel screen to be classified into 2size,the big one and small one.The big one into rock mine specialized sand making machine to be crushing,then to be feeding into the horizontal automatic discharge concentrator with the classified small one mineral,finally the gold concentrate get and tailing ore discharged to destination pool.
Gold mining machinery Detail parameter
Production |
Specification |
Quantity |
Power |
Remark |
Base plate |
17.5m truck chasis |
1pcs |
- |
|
|
|
1set |
- |
|
Vibrating feeder |
3800*750 |
1pcs |
15 |
|
|
PE400*600 |
1set |
30 |
|
|
Inner diameter:1m,outer diameter 1.3m,screen mesh 2.5m central and sides water supplying |
1set |
5.5 |
|
Rock mine specialized sand making machine |
800*1000 |
1set |
90 |
|
Centrifugal concentrator |
Automatic discharge concentrator PLC control |
1set |
21.5 |
|
Sand pump&mineral box |
4inch sand pump+30KW motor+sand pump |
1set |
30 |
|
|
1pcs |
7.5 |
||
Electric box |
Including the electric wire to machie,excluding the cable |
1pcs |
- |
|
Total power |
199.5KW |