200-300tph alluvial gold mining machinery
Gold mining machinery technical process
The raw material into feed hopper by excavator,then high pressure water swilling into reamers trommel screen to be classified into 2size,the big one ans small one,the one in big size into one fixed gold sluice with carpet,the scrap get rid into the scrap pool;
The material in small size into mineral dewater machine by sand pump ,then into mineral box sending to 1200#automatic discharge gold concentrator to be separating finally the concentrate get from concentrate discharge pipe and scrap to get rid into scrap pool.
Gold mining machinery detail parameter
Production |
Specification |
Quantity |
Power |
Remark |
||
|
3500*5500 10mm thick steel |
1set |
- |
|||
Trommel screen |
Reamers trommel screen inner dia.:1.3m(punch manufacturing)outer dia:1.6m,screen mesh 3m,including reamers all over the trommel,2 pcs chain driving, central+sides water supplying |
1set |
7.5 |
including the hopper,holding frames |
||
Mineral deslining machine |
2000*3800 |
1set |
4.4 |
Polyurethane mesh |
||
Gold concentrator |
1200#automatic discharge concentrator |
1set |
21.5 |
PLC control |
||
Mineral box and sand pump |
4inch sand pump 11KW |
2pcs |
22 |
|||
Centrifugal pump |
1pcs |
5.5 |
||||
Submerged pump |
5.5KW |
2pcs |
11 |
|||
Electric box |
1pcs |
- |
||||
Total power |
71.9KW |
Generate set
Production |
Specification |
Quantity |
Power |
Remark |
Generate set |
150KW Yuchai brand |
1set |
- |