Dredging depth10-12m capacity 150m/hour bucket width:1m gold separating dredger

gold dredger

Product introduction

This bucket chain jet suction gold dredger,working capacity 150m3/hour,the recovery rate can be 80-90%,the set of machine is according to customer’s inquiry and our engineer’s experience,design and manufactured by our company,now it’s the well-rounded production and popular abroad and domestic and overseas,the advantage:

1.The side pontoon of dredger and bottom of pontoon using CCSB steel, the shipping board using flower-typed anti slipper steel, with safe guard bar to protect increased the working safety on the pontoon.

2.The square and pentagon wheels: spindle with external sleeve, the spindle locking principle and natural thermal expansion and contraction, and then set side plate welding, the welding process is avoided because the high temperature impact on the main material; left side plate and the connecting plate is inserted into the slot, in order to ensure the structural strength of welding, welding to the five; angle of wheel plate stick oil automobile spring bow plate wear protection.

3.The clamping plate on both sides of the bucket is connected with the two sides of the bucket by numerical control cutting once forming, non welding products. It has the characteristics of tensile resistance, high strength, no deformation and so on

4.The chain is formed by one-time casting, and it does not produce excessive errors such as welding and forging. It has the characteristics of high density molding standard, tensile resistance, strength resistance and low wear rate

5.Gold recovery using vibrating screen, prevent the material from hardening, with high recovery rate, large capacity, low maintenance rate.

6.Generate set Yuchai power brand isrecommended , with the maintenance all over the world

Technical progress

The material of ore digging by bucket of gold dredger then be transported into vibrating screen to be separated into 2sizes,the big one(scrap material)getting rid to scrap area by scrap sluice,the small one getting through the mineral separating machine into 3 set shaking sluice to get gold concentrate then gold are kept in the carpet of sluice,the scrap are getting rid into scrap area.

Detail parameter


 Production Name


 Specification


 Power


 Quantity


 Unit price

 
Total price


 Remark

 
Pontoon

 

Totallength25m,single width1.8m,height1.37m

-

 

1set

 


-


 


-


 

Hoisting gantry

 

-

1pcs

 -

 -

 


Bucket

Bucket

Bucket model 100#

45KW

1set

 -

 -

Chain:106pcs,
73KG/pcs
Bucket:53pcs,
104KG/pcs

 
Chain

 


 Arms


 Length20m/unit,upward water and under water 2unit.


 Pentagon wheels

 

Square wheels

 

The holding frames

 

The engine system

Reducer:1000# 
The motor:45KW


 Vibrating classifier


Vibrating screen

3500*1500mm 
The 1st floor using 24#round steel 
The 2nd floor using polyurethane screen mesh

2.2KW*2

1set

 -

 -

 

 
Feed hopper

 
Using 8mm thickness steel


 Mineral separating machine

 

 
Holding frame


 Holding frames using 20# double T steel


 Scrap sluice

 

-

1pcs

-

-

 


 Shaking sluice

 

3KW*3

3pcs

-

-

 


 The winch for hoisting arms

 

15

1pcs

-

-

 


 The main anchor

 

5.5

1pcs

-

-

 


 The anchor

 

3KW*4

4pcs

-

-

 


 Water pump

 

7.5

2set

-

-

 


 Generate set


 Advise to use 120KW generate set

-

1set

-

-

 


 Total power

105.9KW


The power during working period

76.4KW