River gold dredging boat on delivery I
Gold mining machine dredger technical process
The material from the bucket transported into the trommel screen with reamers which can ream and wash the clay off,then classified into 3sizes ≤6mm,6-15mm,>15mm,the biggest size material >15mm useless are directly discharged to waste area by scrap sluice;
6-15mm material into shaking sluice to get gold nugget, scrap material discharged into the waste area;
The material <6mm getting into the material box through sand pump feeding into a horizontal automatic discharge gold concentrator,then concentrate get into concentrator box, scrap material to be get rid.
Gold mining machine dredger detail parameter
Production Name |
Specifications |
Quantity |
Power |
Remark |
Pontoon |
Single width 2m,height 1.15m,Length 47m |
1set |
- |
|
Bucket system |
Main frame height:5.6m Double 16#U steel |
1set |
75 |
|
Trommel screen |
The trommel fixed with Reamers: length 2.2m |
1set |
7.5 |
|
Gold concentrator |
1200#Horizontal automatic discharging gold concentrator |
1set |
21.5 |
PLC control |
Shaking sluice |
1350*4500mm |
1pcs |
3 |
|
Arms winding engine |
650#reducer |
1pcs |
18.5 |
|
Main Anchor |
500#reducer |
1pcs |
15 |
|
Winch of anchor line |
3KW |
4set |
12 |
|
Water pump |
7.5KW |
1pcs |
7.5 |
|
Centrifugal pump |
7.5KW |
1pcs |
7.5 |
|
Sand pump |
4inch |
1pcs |
11 |
|
Electricity cabint |
Including the electricity wire to machine |
1set |
- |
|
Power |
Power170KW(advise to use230KW generate set) |
The Delivery picture