River gold dredging boat on delivery I

river gold mining machine

Gold mining machine dredger technical process

The material from the bucket transported into the trommel screen with reamers which can ream and wash the clay off,then classified into 3sizes ≤6mm,6-15mm,>15mm,the biggest size material >15mm useless are directly discharged to waste area by scrap sluice;
6-15mm material into shaking sluice to get gold nugget, scrap material discharged into the waste area;
The material <6mm getting into the material box through sand pump feeding into a horizontal automatic discharge gold concentrator,then concentrate get into concentrator box, scrap material to be get rid.

Gold mining machine dredger detail parameter

    Production Name

Specifications

Quantity

Power
/KW

Remark

Pontoon

Single width 2m,height 1.15m,Length 47m

1set

-

Bucket system

Main frame height:5.6m Double 16#U steel
Arms under water:42m 12#/10#U steel
70#Bucket 102pcs
Chain 204pcs
Chain:High manganese steel welding
Reducer:1500#

1set

75

Trommel screen

The trommel fixed with Reamers: length 2.2m
Mesh length:3m,inner diameter:1.3m outside diameter:1.6m
Frame:15#square pipe

1set

7.5

Gold concentrator

1200#Horizontal automatic discharging gold concentrator

1set

21.5

PLC control

Shaking sluice

1350*4500mm

1pcs

3

Arms winding engine

650#reducer

1pcs

18.5

Main Anchor

500#reducer

1pcs

15

Winch of anchor line

3KW

4set

12

Water pump

7.5KW

1pcs

7.5

Centrifugal pump

7.5KW

1pcs

7.5

Sand pump

4inch

1pcs

11

Electricity cabint

Including the electricity wire to machine

1set

-

Power

Power170KW(advise to use230KW generate set)

The Delivery picture

river gold mining machineriver gold mining machineriver gold mining machineriver gold mining machine