Capacity200-300tph alluvial gold separting plant
Capacity200-300tph alluvial gold separting plant
Placer/visible/single crystal gold rocovery above 90%
≤6mm material work capacity 80-100tph
Gold mining machinery technical process
Raw material get into feed hopper by dump truck,then into vibrating screen to be classified into 3size,≤6mm,6-30mm,≥30mm,the material≥30mm useless will be directly getting rid to to scrap pond;
The material 6-30mm get into 2 fixed gold sluice with carpet to be separated,then scrap will be removed the water by bucket dewater machine,then transported by conveyor to destination area;
The size≤6mm material getting into mineral box then pumping by sand pump into horizontal automatic discharge gold concentrator,the scrap into bucket dewater machine to get rid of water,then transported to destination area.
Gold mining machinery detail parameter
|
Specification |
Quantity |
Power |
Remark |
|
4000*5500mm |
1pcs |
- |
|
|
2100*6000mm |
1pcs |
18.5 |
including feed hopper,holding frames etc |
Gold concentrator |
automatic discharge 1200# |
2set |
43 |
PLC control |
|
Bucket1000# |
1set |
22 |
|
|
1000*6000mm |
2set |
- |
including gold carpet |
|
gold concentrator with 6 inch sand pump |
1set |
22 |
|
|
Belt width600mm Pole length10/15m |
2pcs |
15 |
Pole length 15m |
|
11KW |
1set |
11 |
|
|
5.5KW |
1set |
5.5 |
|
|
1set |
- |
Inclduing the electric wire excluding the cable |
|
|
137KW |