Capacity200-300tph alluvial gold separting plant

gold mining machinery

Capacity200-300tph alluvial gold separting plant

Placer/visible/single crystal gold rocovery above 90%

≤6mm material work capacity 80-100tph

Gold mining machinery technical process

Raw material get into feed hopper by dump truck,then into vibrating screen to be classified into 3size,≤6mm,6-30mm,≥30mm,the material≥30mm useless will be directly getting rid to to scrap pond;

The material 6-30mm get into 2 fixed gold sluice with carpet to be separated,then scrap will be removed the water by bucket dewater machine,then transported by conveyor to destination area;

The size≤6mm material getting into mineral box then pumping by sand pump into horizontal automatic discharge gold concentrator,the scrap into bucket dewater machine to get rid of water,then transported to destination area.

Gold mining machinery detail parameter

 
Production

 

Specification

 Quantity

Power

Remark


 Feed hopper

4000*5500mm

1pcs

-


 Vibrating screen

2100*6000mm

1pcs

18.5

 

including feed hopper,holding frames etc

Gold concentrator

automatic discharge 1200#

2set

43

PLC control

 
Bucket dewater machine

Bucket1000#

1set

22


 Fixed gold sluice with carpet

1000*6000mm

2set

-

 

including gold carpet


 Mineral box and sand pump

gold concentrator with 6 inch sand pump

1set

22


 Transport conveyor

Belt width600mm

Pole length10/15m

2pcs

15

 

Pole length 15m


 Centrifugal pump

11KW

1set

11


 Water pump

5.5KW

1set

5.5


 Electric box

1set

-

 

Inclduing the electric wire excluding the cable


 Total power

137KW